Erzurum City Hospital
The construction of Erzurum City Hospital, which was completed a short time ago, started in 2013. The hospital, which was designed by the Minister of Health of the period, Recep Akdağ, was prepared for the opening with the instructions of the President. The comfort of the hospital, which cost 700 million liras in total, is among the topics that started to be discussed before it was opened. There are 1,570 beds in the hospital. In addition, there are 272 intensive care beds, 310 polyclinics, and 40 operating rooms. There are 44 dialysis beds and 36 imaging rooms. The hospital has a closed area of 419 thousand square meters. It has 4 blocks. The hospital complex consists of blocks A, B, C and D. The rooms have facilities such as bathroom and toilet, and service is provided in the comfort of a hotel.